Segment 2
Segment 2 is located in an existing pipeline ROW along Fairview Drive and South Edmonds Drive, and just south of East 5th Street (SR 513). Segment 2 is approximately 1.58 miles along Paiute’s existing Carson Lateral. The segment alignment will begin at Paiute’s existing Carson City Gate (CG) #5 located at the intersection of Fairview Drive and SR 513 and proceed southwest along Fairview Drive and South Edmonds Drive within existing public ROW. The proposed pipeline alignment crosses BLM-administered land (19%), State of Nevada land (39%), and private land (42%). This area was previously disturbed during the installation of Paiute’s two existing mainlines in 1964 and 1977.
The proposed Project work will entail replacing approximately 8,300 feet of Paiute’s existing 8-inch diameter steel Carson Lateral Loop pipeline with new 12-inch diameter steel pipe immediately adjacent to the existing 8-inch diameter Carson Lateral pipeline. Four temporary work spaces are being evaluated for use during construction, all within previously disturbed areas. One work space will be located at the north end of the segment on BLM-administered land on the east side of the pipeline corridor. Two work spaces will be centrally located at the intersection of Fairview Drive and Edmonds Drive. A fourth work space will be located at the south end of the segment on private land in a previously disturbed area. Construction access will be via public ROW and no new access will be constructed. All work is expected to occur within the existing public ROW that Paiute has already used for construction of its existing pipelines.
Segment2